Manufacturing, in the plant's own words.
Sales promises dates the plant learns about later. Capacity and materials live in different systems, and the plan is rebuilt by hand every Monday.
- Available to promiseThe order desk
- The frozen periodThe scheduling board
- The bottleneckOne machine, or one cell
- ChangeoverThe setter, at the machine
- The shortage listPurchasing and receiving
- The held batchThe quarantine cage
- The maintenance windowThe maintenance calendar

A drill entering a turned part. Every term in this guide arrives, sooner or later, at a spindle like this one.
A plant runs on a vocabulary its systems never share. The planner says frozen and means one thing, sales hears it and means another, and the order lands on the schedule anyway.
This guide sets down the terms that decide whether a date holds, with what each one means, where it sits in the plant, and which decision it governs. Every entry points to others. On the floor they are one problem. In the systems that record them, they are separate rows kept by separate teams.

Available to promise
The quantity the plant can still commit to a customer for a given date, once every order already accepted has taken its share of stock, capacity, and material.
- Sits
- The order desk, and at the end of the line, the packing floor where the promise comes due.
- Governs
- Whether a new order gets the date the customer asked for.
The packing floor. A promised date is kept or missed here, long after the desk that made it has moved on to the next order.
Sales quotes from the stock figure in the system that owns the orders. That figure does not know that the bottleneck is full on the dates in question, or that the order's material is on the shortage list. The plant finds out when the order reaches the schedule, and by then the date has been given.
See also the bottleneck and the shortage list.
The frozen period
The stretch of the schedule nearest to today, inside which the plan no longer changes. Material is cut, operators are assigned, and any change costs more than it looks.
- Sits
- The scheduling board in the planner's office, and the dispatch list at each work center.
- Governs
- Whether a rush order breaks in, and which accepted order it pushes out.
A rush order inside the frozen period is always a trade, because someone else's date moves to make room for it. The planner works out whose by hand, on the board, and the customer who loses hears about it last.
See also changeover and available to promise.


A machining center. In many plants this is where every order queues, and where time lost is lost to the whole plant.

The press brake. The first piece after a die change, checked before the run is allowed to start.
The bottleneck
The one resource whose capacity sets the output of the whole plant. Time lost there is lost to every order behind it.
- Sits
- Usually one machine or one cell, such as the machining center, the oven, or the paint line. Every planner knows which.
- Governs
- What runs next, and what is allowed to wait in front of it.
Capacity is planned in one system and actual hours are booked in another, so the load on the bottleneck is known after the shift, when it can no longer be changed. Every date the order desk gives is, in the end, a claim on this machine.
See also changeover and the maintenance window.
Changeover
The time a machine stands still while it is reset for the next product, with dies swapped, fixtures moved, and the first piece checked.
- Sits
- At the machine, with the setter and the first-piece inspector.
- Governs
- The sequence of jobs, and whether a small order is worth breaking a run.
At the bottleneck, a changeover spends the plant's scarcest hours. A sequence that groups similar jobs saves them. A rush order that splits a run spends them twice, once to break in and once to go back.
See also the bottleneck and the frozen period.

Material in transit. On the shortage list it is one line with a date beside it. On the road it is a truck, somewhere, and the date is a hope.
The shortage list
The materials the schedule needs and the plant does not yet have, set against the orders that are waiting for them.
Purchasing hears of a slip first, planning second, and the customer last. The material that did arrive goes to whichever order someone fights hardest for, which is rarely the order that matters most. The list itself is a spreadsheet, rebuilt each morning from several systems and out of date by the time it is printed.
See also available to promise and the bottleneck.
- Sits
- Purchasing, the receiving dock, and the supplier's truck.
- Governs
- Which of the waiting orders a late material goes to first.

The inspection frame. Every roll passes under the light here before it may ship, and a fault found here is where a batch is first held.
The held batch
Product that has been made and may not ship until quality releases it. It is counted in stock and available to no order.
- Sits
- The quarantine cage, under a hold tag, and the quality manager's open nonconformance record.
- Governs
- Whether to release the batch, rework it, or scrap it.
The quality manager weighs the defect. The cost of the hold is counted elsewhere, in the orders waiting on the batch, their penalties, and the line time to make it again, and none of that is on the hold record.
See also available to promise.

A cutter under coolant. Wear on this edge, and on the spindle behind it, is what every maintenance window is weighed against.
The maintenance window
Time set aside to stop an asset for planned work, before wear stops it without asking.
- Sits
- The maintenance planner's calendar, and the spindle, bearing, or cutter that is wearing.
- Governs
- Whether the asset stops when maintenance planned it, or when production can spare it.
Maintenance plans by condition and running hours, production plans by orders, and the two calendars meet in an argument. Moving a window later spends risk on the asset. Moving it earlier spends output the order desk has already promised.
See also the bottleneck and the frozen period.
Every decision in the plant reads several entries at once.
No decision sits inside one term. Each draws on several, kept today in separate systems by separate teams. On joined data they arrive together, in front of the person who answers for the decision.
- Answers for it
- The plant manager, with sales at the table.
Each late receipt arrives with the orders it starves, their dates, and their customers, so the plant can choose which to protect before sales gives a date it cannot keep.
Reads the shortage list, available to promise, and the bottleneck.
- Answers for it
- The plant manager.
The request comes with the orders it would push out, their customers, and the changeovers it would add at the bottleneck. The plant manager signs the trade as one approved action, and the schedule changes only then.
Reads the frozen period, available to promise, the bottleneck, and changeover.
- Answers for it
- The quality manager.
The hold record shows what the batch blocks and what remaking it would take. The release carries its evidence and the one signature it needs, and stays in the decision history.
Reads the held batch and available to promise.
- Answers for it
- The maintenance manager and the production manager, together.
Both read the same window against the same orders and the same condition of the asset, so the argument is about the trade, and no longer about whose figures are right.
Reads the maintenance window, the bottleneck, and the frozen period.

The definitions stay with the people who own them.
Available, held, and frozen each mean something exact in your plant, and something slightly different in every system that records them. We start from one decision and the people who take it, and agree each term it rests on with its owner, such as where the frozen period ends, what counts as available, and when a batch is held. The agreed definition becomes the one figure every screen reads, a shared metric.
The scheduling board, the hold record, and the maintenance calendar keep their shape and their owners. They become operational apps over the same joined data, so a change made on one is the fact the others read.
Start with the decision your plant argues about most.
Bring us the one that costs the most when it goes wrong. An engineer of ours sits with the people who take it, agrees its terms with them, and puts that decision on joined data before any other.